Drains approximately 51,840 cu. ft in 24 hrs., 155,520 cu. ft in 3 days, or 362,880 cu. ft in 7 days.
Pipe for barrel NOT INCLUDED – you will need 10 feet or more of 6″ Sch 40 solid PVC pipe for the barrel. Length should be a minimum of 1.4 x the depth of the basin at the overflow.
Skimmer shipping wt. approx. 230.
Shipping: We will contact you with shipping costs.